{"id":7177,"date":"2026-04-02T10:58:22","date_gmt":"2026-04-02T02:58:22","guid":{"rendered":"https:\/\/www.ahkfjx.com\/?p=7177"},"modified":"2026-04-15T17:26:42","modified_gmt":"2026-04-15T09:26:42","slug":"industrial-chiller-system-installation-steps-and-mistakes","status":"publish","type":"post","link":"https:\/\/www.ahkfjx.com\/fr\/industrial-chiller-system-installation-steps-and-mistakes\/","title":{"rendered":"Installation d'un syst\u00e8me de refroidissement industriel : \u00c9tapes et erreurs"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"7177\" class=\"elementor elementor-7177\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-714e2b3 e-flex e-con-boxed e-con e-parent\" data-id=\"714e2b3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-412e70c elementor-widget elementor-widget-text-editor\" data-id=\"412e70c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Installing an industrial chiller isn&#8217;t like putting in a window air conditioner. It&#8217;s a major mechanical project that touches electrical systems, plumbing, building structure, and sometimes even the local utility. Watched a few of these go down over the years. The ones that go well share something in common: someone thought through the whole sequence before the first piece of equipment showed up. The ones that go sideways usually skipped a step or made an assumption that turned out to be wrong.<\/p><p>This is a look at the typical steps for an<a href=\"https:\/\/www.ahkfjx.com\/fr\/product-category\/industrial-chiller\/\"><strong> syst\u00e8me de refroidissement industriel<\/strong><\/a> installation, along with the mistakes that keep showing up on job sites.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ee83d71 elementor-widget__width-initial elementor-widget elementor-widget-image\" data-id=\"ee83d71\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/02\/Water-cooled-chiller13-1024x768.jpg\" class=\"attachment-large size-large wp-image-3643\" alt=\"refroidisseur d&#039;eau industriel\" srcset=\"https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/02\/Water-cooled-chiller13-1024x768.jpg 1024w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/02\/Water-cooled-chiller13-300x225.jpg 300w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/02\/Water-cooled-chiller13-768x576.jpg 768w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/02\/Water-cooled-chiller13-1536x1152.jpg 1536w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/02\/Water-cooled-chiller13.jpg 2016w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-14bd0c7 elementor-widget elementor-widget-heading\" data-id=\"14bd0c7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Pre-Installation Planning for an Industrial Chiller System<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b6ae49e elementor-widget elementor-widget-text-editor\" data-id=\"b6ae49e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Before any equipment arrives, there&#8217;s work to do. This phase determines whether the installation goes smoothly or turns into a series of surprises.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-afdb580 elementor-widget elementor-widget-heading\" data-id=\"afdb580\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\"> Site Assessment<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c7cbd7a elementor-widget elementor-widget-text-editor\" data-id=\"c7cbd7a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The physical space needs to be evaluated. Not just &#8220;does the chiller fit,&#8221; but:<br \/>\u2022 Is there room for service access? (Condenser coil cleaning, tube pulling, compressor replacement all need clearance.)<br \/>\u2022 Can the floor support the weight? (A large chiller with refrigerant and water can weigh several tons.)<br \/>\u2022 Is there overhead clearance for rigging? (Getting a chiller into a mechanical room sometimes requires removing walls or bringing it in through the roof.)<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-482e969 elementor-widget elementor-widget-heading\" data-id=\"482e969\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Utility Coordination<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-02f84ce elementor-widget elementor-widget-text-editor\" data-id=\"02f84ce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Electrical service needs to be confirmed. A large industrial chiller system might require a new transformer or an upgrade to the main switchgear. Utility lead times for transformer installation can run six months or more. That&#8217;s the kind of delay that derails a project timeline if it&#8217;s not addressed early.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9a49e5a elementor-widget elementor-widget-heading\" data-id=\"9a49e5a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Permitting<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fe8a37b elementor-widget elementor-widget-text-editor\" data-id=\"fe8a37b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Mechanical, electrical, and sometimes plumbing permits are required. Some jurisdictions have specific requirements for refrigerant handling, seismic bracing, or outdoor equipment screening. Starting the permit process early\u2014before equipment is ordered\u2014prevents the situation where the chiller arrives but can&#8217;t be installed because the permit hasn&#8217;t been issued.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c989472 elementor-widget elementor-widget-heading\" data-id=\"c989472\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Step-by-Step Installation of an Industrial Chiller System<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-95b6ff5 elementor-widget elementor-widget-text-editor\" data-id=\"95b6ff5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Once planning is complete, the physical installation follows a sequence. Each step depends on the one before it.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-43793ce elementor-widget elementor-widget-heading\" data-id=\"43793ce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 1 \u2013 Site Preparation<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5b0eb0a elementor-widget elementor-widget-text-editor\" data-id=\"5b0eb0a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The installation area is prepared. This might mean pouring a concrete pad for an outdoor unit, reinforcing the roof structure for a rooftop installation, or creating a raised curb for indoor mounting with proper drainage. Vibration isolation pads or spring mounts are installed at this stage to prevent structural noise transmission.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0b19d78 elementor-widget elementor-widget-heading\" data-id=\"0b19d78\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 2 \u2013 Setting the Chiller<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7e1a491 elementor-widget elementor-widget-text-editor\" data-id=\"7e1a491\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The chiller is moved into position. For larger units, this involves a crane, rigging crew, and careful coordination. The ones that go smoothly have a rigging plan that accounts for weight distribution, access paths, and overhead obstacles. The ones that don&#8217;t sometimes end up with a chiller sitting in the parking lot for days while someone figures out how to get it through a doorway that&#8217;s six inches too narrow.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-afd0b8b elementor-widget elementor-widget-heading\" data-id=\"afd0b8b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 3 \u2013 Piping Installation<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-241d559 elementor-widget elementor-widget-text-editor\" data-id=\"241d559\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Piping connects the chiller to the process equipment, pumps, and (for water-cooled units) the cooling tower. This is where details matter.<\/p><p>Common piping elements:<br \/>\u2022 Supply and return headers sized for proper flow<br \/>\u2022 Isolation valves at the chiller to allow service without draining the entire system<br \/>\u2022 Strainers on the inlet side to protect the chiller from debris<br \/>\u2022 Flexible connections to isolate vibration<br \/>\u2022 Pressure and temperature ports for monitoring<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8df70fb elementor-widget elementor-widget-heading\" data-id=\"8df70fb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 4 \u2013 Electrical Connections<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c43790c elementor-widget elementor-widget-text-editor\" data-id=\"c43790c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Power is run from the main distribution panel to the chiller. This includes:<br \/>\u2022 Disconnect switch within sight of the chiller<br \/>\u2022 Proper wire sizing for the ampacity and distance<br \/>\u2022 Control wiring for communication with building automation systems<br \/>\u2022 Grounding per code<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fbffb95 elementor-widget elementor-widget-heading\" data-id=\"fbffb95\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 5 \u2013 Refrigerant and Charge<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-df3f92b elementor-widget elementor-widget-text-editor\" data-id=\"df3f92b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>For systems shipped with refrigerant, the charge is verified. For field-charged systems, refrigerant is added, and the system is leak-checked. This is a critical step\u2014leaks that go unnoticed at installation become service calls later.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f74781d elementor-widget elementor-widget-heading\" data-id=\"f74781d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 6 \u2013 System Fill and Purge<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-86343ad elementor-widget elementor-widget-text-editor\" data-id=\"86343ad\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The water side is filled, air is purged from the system, and chemical treatment is added. Air in the system causes noise, reduced heat transfer, and potential cavitation in pumps. A proper fill and purge process takes time but prevents headaches during startup.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-64c6066 elementor-widget elementor-widget-heading\" data-id=\"64c6066\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 7 \u2013 Startup and Commissioning<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fd85b83 elementor-widget elementor-widget-text-editor\" data-id=\"fd85b83\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>This is where everything comes together. The startup technician verifies:<br \/>- Pressions et temp\u00e9ratures de fonctionnement<br \/>\u2022 Flow rates<br \/>\u2022 Control sequences<br \/>\u2022 Safety interlocks<\/p><p>A formal commissioning report documents baseline performance. That baseline becomes valuable later when troubleshooting performance drift.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9fe6955 elementor-widget__width-initial elementor-widget elementor-widget-image\" data-id=\"9fe6955\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/08\/New-Project-15.jpg\" class=\"attachment-large size-large wp-image-5958\" alt=\"refroidisseur industriel\" srcset=\"https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/08\/New-Project-15.jpg 800w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/08\/New-Project-15-300x300.jpg 300w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/08\/New-Project-15-150x150.jpg 150w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/08\/New-Project-15-768x768.jpg 768w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/08\/New-Project-15-12x12.jpg 12w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e8a19f5 elementor-widget elementor-widget-heading\" data-id=\"e8a19f5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Common Mistakes During Industrial Chiller System Installation<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1e5bfff elementor-widget elementor-widget-text-editor\" data-id=\"1e5bfff\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Some mistakes appear repeatedly across different projects. Knowing them in advance helps avoid them.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e11c17b elementor-widget elementor-widget-heading\" data-id=\"e11c17b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Mistake 1 \u2013 Ignoring Service Access<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9ec711c elementor-widget elementor-widget-text-editor\" data-id=\"9ec711c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The chiller fits. But when the time comes to pull condenser tubes for cleaning, there&#8217;s no room to get the tube puller in. Or the disconnect switch is placed behind the chiller, requiring a shutdown just to reset a tripped breaker. Service access needs to be designed in, not assumed.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-29c550a elementor-widget elementor-widget-heading\" data-id=\"29c550a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Mistake 2 \u2013 Undersized Piping<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c3a70a9 elementor-widget elementor-widget-text-editor\" data-id=\"c3a70a9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Piping that&#8217;s too small creates excessive pressure drop. The chiller might be sized correctly, but the pumps can&#8217;t move enough water to deliver the rated capacity. This mistake is expensive to fix after installation because it requires re-piping.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1d97b10 elementor-widget elementor-widget-heading\" data-id=\"1d97b10\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Mistake 3 \u2013 Inadequate Water Treatment<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-672675d elementor-widget elementor-widget-text-editor\" data-id=\"672675d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>A new industrial chiller system can be damaged in its first year by untreated water. Scale in the condenser tubes, corrosion in the evaporator, biological growth in the cooling tower\u2014all preventable with a proper water treatment program from day one.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5b48d52 elementor-widget elementor-widget-heading\" data-id=\"5b48d52\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Mistake 4 \u2013 Skipping Controls Integration<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17925bb elementor-widget elementor-widget-text-editor\" data-id=\"17925bb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The chiller runs, but it doesn&#8217;t talk to the building automation system. So when the building automation calls for cooling, nothing happens. Or the chiller runs when the pumps are off. Controls integration needs to be tested during commissioning, not discovered after occupancy.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d540723 elementor-widget elementor-widget-heading\" data-id=\"d540723\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Mistake 5 \u2013 Forgetting About Noise<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-504e9a0 elementor-widget elementor-widget-text-editor\" data-id=\"504e9a0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>An air-cooled chiller placed near an office wall or a property line can create noise complaints. Some municipalities have strict noise ordinances. Checking sound levels and providing barriers or low-noise fans during installation is easier than retrofitting later.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-56774e7 elementor-widget__width-initial elementor-widget elementor-widget-image\" data-id=\"56774e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/09\/12.png\" class=\"attachment-large size-large wp-image-6339\" alt=\"refroidisseur industriel\" srcset=\"https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/09\/12.png 800w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/09\/12-300x300.png 300w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/09\/12-150x150.png 150w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/09\/12-768x768.png 768w, https:\/\/www.ahkfjx.com\/wp-content\/uploads\/2025\/09\/12-12x12.png 12w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7296f7f elementor-widget elementor-widget-heading\" data-id=\"7296f7f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Consid\u00e9rations particuli\u00e8res pour les diff\u00e9rents types de refroidisseurs<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a1db92c elementor-widget elementor-widget-text-editor\" data-id=\"a1db92c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The installation approach varies depending on the type of chiller.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6303e3d elementor-widget elementor-widget-tablepress-table\" data-id=\"6303e3d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"tablepress-table.default\">\n\t\t\t\t\t\n<table id=\"tablepress-46\" class=\"tablepress tablepress-id-46\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Type de refroidisseur<\/th><th class=\"column-2\">Installation Considerations<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Refroidisseur \u00e0 air<\/td><td class=\"column-2\">Outdoor placement; clearance around condenser coils; sound attenuation; freeze protection for water side in cold climates<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Refroidisseur \u00e0 eau<\/td><td class=\"column-2\">Indoor placement common; cooling tower or fluid cooler required; condenser water piping; water treatment essential<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-46 from cache -->\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-63cf342 elementor-widget elementor-widget-text-editor\" data-id=\"63cf342\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>For a <a href=\"https:\/\/www.ahkfjx.com\/fr\/product\/water-cooled-chiller\/\"><strong>refroidisseur \u00e0 eau<\/strong><\/a>, the cooling tower installation is a significant sub-project. Tower placement, makeup water supply, basin heaters for winter operation, and drift eliminators all need to be coordinated. For an <a href=\"https:\/\/www.ahkfjx.com\/fr\/product\/air-cooled-chiller\/\"><strong>refroidisseur \u00e0 air<\/strong><\/a>, the focus is on airflow\u2014units placed too close to walls or under overhangs struggle to reject heat properly.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a99641b elementor-widget elementor-widget-heading\" data-id=\"a99641b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Post-Installation Checklist<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-55e0065 elementor-widget elementor-widget-text-editor\" data-id=\"55e0065\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>After the installation is complete and the system is running, a few steps ensure long-term reliability.<br \/>1. Document as-built conditions: Piping diagrams, electrical one-lines, and control sequences should reflect what was actually installed.<br \/>2. Provide operator training: Someone on site needs to know how to check pressures, change settings, and recognize warning signs.<br \/>3. Establish a maintenance schedule: Monthly, quarterly, and annual tasks should be written down before the system is put into production.<br \/>4. Keep spare parts: Critical spares\u2014fuses, filters, belts, sensors\u2014prevent extended downtime when something fails.<\/p><p>If you want to know more about industrial chiller, please read <a href=\"https:\/\/www.ahkfjx.com\/fr\/how-to-integrate-an-industrial-chiller-system-into-your-factory\/\"><strong>Comment int\u00e9grer un syst\u00e8me de refroidissement industriel dans votre usine.<\/strong><\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-73d83097 e-con-full e-flex e-con e-parent\" data-id=\"73d83097\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-464a9fe5 elementor-widget__width-inherit elementor-widget elementor-widget-heading\" data-id=\"464a9fe5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-66db1d87 elementor-widget elementor-widget-n-accordion\" data-id=\"66db1d87\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;expanded&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accord\u00e9on. Ouvrez les liens avec Enter ou Space, fermez-les avec Escape et naviguez avec les touches fl\u00e9ch\u00e9es.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1720\" class=\"e-n-accordion-item\" open>\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"true\" aria-controls=\"e-n-accordion-item-1720\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How long does industrial chiller system installation typically take? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1720\" class=\"elementor-element elementor-element-166bbfa9 e-con-full e-flex e-con e-child\" data-id=\"166bbfa9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d3b22df elementor-widget elementor-widget-text-editor\" data-id=\"d3b22df\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>From equipment delivery to startup, installation usually takes 2 to 4 weeks for a straightforward project. Total project timeline including planning, permitting, and utility coordination can range from 4 to 10 months.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1721\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1721\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can an existing chiller be replaced with a new one in the same footprint? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1721\" class=\"elementor-element elementor-element-7ee2c9db e-con-full e-flex e-con e-child\" data-id=\"7ee2c9db\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5e0e4c3 elementor-widget elementor-widget-text-editor\" data-id=\"5e0e4c3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Often yes, but piping connections and electrical requirements may differ. A site survey before ordering equipment confirms whether modifications are needed.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1722\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1722\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What's the most common installation mistake that leads to early failure? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1722\" class=\"elementor-element elementor-element-529922ab e-con-full e-flex e-con e-child\" data-id=\"529922ab\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-909e7c3 elementor-widget elementor-widget-text-editor\" data-id=\"909e7c3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Inadequate water treatment from day one is a top contributor to premature tube fouling and corrosion. Starting with a clean system but no chemical program guarantees problems within the first year.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<script type=\"application\/ld+json\">{\n    \"@context\": \"https:\\\/\\\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"How long does industrial chiller system installation typically take?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"From equipment delivery to startup, installation usually takes 2 to 4 weeks for a straightforward project. Total project timeline including planning, permitting, and utility coordination can range from 4 to 10 months.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Can an existing chiller be replaced with a new one in the same footprint?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Often yes, but piping connections and electrical requirements may differ. A site survey before ordering equipment confirms whether modifications are needed.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What's the most common installation mistake that leads to early failure?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Inadequate water treatment from day one is a top contributor to premature tube fouling and corrosion. Starting with a clean system but no chemical program guarantees problems within the first year.\"\n            }\n        }\n    ]\n}<\/script>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Installing an industrial chiller isn&#8217;t like putting in a window air conditioner. It&#8217;s a major mechanical project that touches electrical systems, plumbing, building structure, and sometimes even the local utility. Watched a few of these go down over the years. The ones that go well share something in common: someone thought through the whole sequence [&hellip;]<\/p>","protected":false},"author":15,"featured_media":5818,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[9],"tags":[35],"class_list":["post-7177","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-knowledge","tag-industrial-chiller"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/posts\/7177","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/comments?post=7177"}],"version-history":[{"count":10,"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/posts\/7177\/revisions"}],"predecessor-version":[{"id":7190,"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/posts\/7177\/revisions\/7190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/media\/5818"}],"wp:attachment":[{"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/media?parent=7177"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/categories?post=7177"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ahkfjx.com\/fr\/wp-json\/wp\/v2\/tags?post=7177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}